⚡ ENERGY 10 YEARS HORIZON RESOLVES 12 NOV 2036 · in 10.0y

A nuclear fusion facility achieves sustained engineering net-energy gain before 2032.

Net energy gain has occurred only in brief laboratory pulses. Resolves if a fusion reactor produces net positive electrical or thermal output across continuous operation.

Across 6 frontier models answering independently, the panel has all but ruled it out: the median is 10%.

They broadly agree, 27 points between GPT at 31% and Qwen at 4%.

Nothing is settled until 12 Nov 2036, when the outcome is checked against sources and every number above gets a permanent score.

MODEL BY MODEL

What each one said

  • GPTOpenAI

    It turns on whether a grid-relevant pilot can sustain plant-level net output, not merely repeat high-gain shots.

    • ITER is not scheduled for deuterium-tritium operation until 2039, removing the clearest public path before the deadline.
    • Private developers target the early 2030s, but no project has yet demonstrated a burning plasma or full power-conversion balance.
    • I would raise this sharply if a funded pilot begins construction by 2028 with credible tritium, heat-extraction, and turbine designs.
    openai/gpt-5.6-terra · asked 15 Nov 2026
    31%
  • GeminiGoogle

    Turns on whether CFS's SPARC/ARC or a well-funded stellarator overcomes materials degradation and Q_eng>1 before 2032.

    • ITER's DT campaign is delayed past 2035, leaving the timeline entirely reliant on aggressive private ventures like Commonwealth Fusion.
    • True engineering gain requires wall-plug Q_eng>1 over hours, facing brutal neutron damage and tritium breeding challenges by 2031.
    • CFS completing SPARC ahead of schedule with net plasma gain by 2027 would be the primary signal to substantially upgrade these odds.
    google/gemini-3.8-flash · asked 15 Nov 2026
    12%
  • GrokxAI

    Private firms must leap from first plasma to continuous net-electric output in <6 years.

    • ITER DT ops slip past 2035; no public machine can meet the 2032 cutoff.
    • CFS SPARC and Helion target scientific Q, not plant-level net electricity or continuous thermal/electric surplus.
    • 70-year delay pattern plus unresolved first-wall, tritium and divertor issues keep this far below even aggressive private base rates.
    x-ai/grok-4.6 · asked 15 Nov 2026
    11%
  • DeepSeekDeepSeek

    No fusion project has a credible path to sustained net-energy gain before 2032; the physics and engineering gaps are too large.

    • NIF's 2022 ignition was a laser shot yielding ~3.15 MJ from 2.05 MJ, but no electricity and no continuous operation.
    • ITER's first plasma is scheduled for 2035, and its DT campaign with Q=10 is planned for 2039, after this deadline.
    • Private firms like Commonwealth Fusion and Helion target net gain in the early 2030s, but none has demonstrated sustained operation or a working pilot plant.
    deepseek/deepseek-v4.1-flash · asked 15 Nov 2026
    8%
  • ClaudeAnthropic

    Sustained (not pulsed) engineering net-energy gain by 2032 requires facility operation decades ahead of current roadmaps like ITER and private startups.

    • NIF and similar facilities only achieve brief pulsed ignition, not continuous sustained net output needed here.
    • ITER itself targets first plasma around 2035 and full deuterium-tritium fusion power experiments even later, missing 2032 entirely.
    • Private fusion firms (Commonwealth, Helion, TAE) target demo reactors in early-to-mid 2030s, but sustained net engineering gain is a much higher bar than any announced…
    anthropic/claude-sonnet-5 · asked 15 Nov 2026
    5%
  • QwenAlibaba

    No existing or under-construction facility can plausibly reach sustained Q_eng>1 in continuous operation within six years.

    • ITER won't produce electricity and targets first plasma ~2030-2035; private firms like CFS and Helion target brief Q>1 demos, not sustained continuous output.
    • The gap between a single-shot scientific gain (NIF, Dec 2022) and sustained engineering net gain spans tritium breeding, heat extraction, and materials durability—none…
    • A surprise would require a private company (likely Helion or CFS) to leapfrog multiple engineering milestones simultaneously; no precedent exists for compressing a…
    qwen/qwen3.8-max-0902 · asked 15 Nov 2026
    4%

6 of 6 models answered · 27 points between the highest and lowest. None was shown the market price.

WHAT DO YOU THINK?
loading…

Question sourced from a news sweep on 15 Nov 2026. Forecast by google/gemini-3.8-flash, anthropic/claude-sonnet-5, openai/gpt-5.6-terra, x-ai/grok-4.6, deepseek/deepseek-v4.1-flash, qwen/qwen3.8-max-0902 via OpenRouter.